How to set up an ISKYPOOL Drop Stitch pool

How to set up an ISKYPOOL Drop Stitch pool: site preparation, valve tightening, inflation to 10 PSI, equipment connection, filling and proper seasonal storage.

Pool scene at sunset.
ISKYPOOL Β· SETUP GUIDE

How to set up an ISKYPOOL
Drop Stitch pool

One of the original ideas behind ISKYPOOL was simple: a full-size swimming pool should be quick to set up without spending hours assembling its structure.

A Drop Stitch pool does not use a traditional external metal frame. There are no frame tubes, support legs, braces or connectors to assemble. The pool wall itself becomes rigid when inflated to its specified operating pressure.

THE SETUP PRINCIPLE
Unpack β†’ unfold β†’ check the valve β†’ inflate β†’ connect the equipment β†’ fill with water.
Typically around 8–25 minutes
Setting up the main ISKYPOOL pool structure typically takes approximately 8–25 minutes, depending on the model size and conditions. Site preparation, additional equipment installation and filling the pool with water are separate processes.

1. Choose the right location

ISKYPOOL does not require a specially constructed foundation simply because it uses Drop Stitch technology. But any full-size pool contains several tonnes of water once filled, so the quality of the base matters.

Stable
The ground or supporting surface must not settle under the load.
Sufficiently level
The installation area should not have a significant slope.
Free from sharp objects
Remove stones, glass, branches, sharp roots and other debris.
Practical for you
Allow suitable space for the ladder, filtration and access.

The site does not need to be perfectly level to the millimetre. But the water surface will always remain horizontal, so a noticeable slope underneath the pool will result in different water levels relative to the upper edge.

2. Unpack and unfold the pool

Move the packed pool as close as practical to its final location, remove it from the storage bag and carefully unfold it on the prepared surface.

Before inflation, this is the easiest time to decide:

β€’ where the ladder will be positioned;
β€’ which side the filtration system will be located on;
β€’ where the heat pump will stand, if one is used;
β€’ whether the air valve remains easily accessible;
β€’ whether there is enough practical access around the pool.

Once the pool contains several tonnes of water, deciding to move it half a metre to the side is somewhat late. Larger ISKYPOOL models also have substantial product weight, so several people may be useful for carrying and unfolding them.

3. Check and tighten the air valve before inflation

Do not skip this step
Before the first inflation, check the tightness of the air valve body. The main valve tightening must be performed with the pool completely deflated, using the supplied valve wrench.

With the pool deflated, the material surrounding the valve is not under operating pressure, allowing the valve body to be correctly secured. After checking it, place the valve in its normal operating position according to the instructions.

4. Connect a high-pressure electric compressor

ISKYPOOL swimming pools are designed for an operating pressure of 10 PSI.

Removing the frame and then spending hours manually pumping a full-size pool would be a rather strange way to save time.
That is why ISKYPOOL uses a high-pressure electric compressor capable of bringing the wall to the required operating pressure.

A conventional low-pressure blower can move a large volume of air quickly, but it cannot provide the 10 PSI required by an ISKYPOOL pool.

5. Inflate the wall to 10 PSI

As the wall fills with air, the soft folded structure begins to take its intended shape.

Thousands of internal threads
Connect the opposing Drop Stitch surfaces.
The threads become tensioned
Controlling the distance between the two surfaces.
The wall becomes rigid
Maintaining its intended geometry under pressure.
No external frame is required
The pressurized wall itself becomes structural.
At the specified operating pressure of 10 PSI, the main supporting pool structure is ready. There is no traditional frame left to assemble.

6. Check the valve again after inflation

Once the pool has reached operating pressure, check the air valve again. If required, carefully perform a final check-tightening using the valve wrench, without excessive force. The main initial tightening has already been completed while the pool was fully deflated.

7. Connect the filtration system and equipment

Once the main pool structure is ready, connect the required equipment according to its instructions.

Filtration system
Skimmer
Ladder
Heat pump

The ISKYPOOL Pro Gear Kit uses a sand filtration system. The philosophy is the same as with the pool itself: equipment should save the owner's time, not create more work.

8. Start filling the pool with water

Once the position, operating pressure and connections have been checked, you can begin filling the pool.

During the early stage of filling, check again that:

β€’ the pool is correctly positioned;
β€’ there is no obvious tilt;
β€’ the base remains stable;
β€’ all connections are leak-free;
β€’ the wall is maintaining its operating pressure.

Correcting the position or a connection now is much easier than doing it after the pool is completely full.

9. Check the air valve again after 2–3 days

Check after the first few days of use
After approximately 2–3 days, check the valve tightness once more. If necessary, make a small additional adjustment using the supplied valve wrench.

After this, the valve should not require constant attention. If the pool continues to lose significant pressure, investigate the cause rather than repeatedly tightening the valve.

WHAT IS THE DIFFERENCE?
You do not assemble a rigid structure.
You inflate it.
A frame pool becomes rigid after the owner assembles its supporting structure. ISKYPOOL becomes rigid after the compressor creates the required pressure. That is one of the most practical advantages of Drop Stitch technology.

How to store your ISKYPOOL properly after the season

The simplicity of Drop Stitch becomes especially noticeable when the season ends. But the pool should never simply be drained, deflated and packed away while still wet.

During the season, the surfaces can accumulate pool chemicals, mineral deposits, sunscreen, body oils, organic contamination, dust and dirt.

01

Drain all water

Disconnect the equipment and drain the pool according to the instructions.
02

Rinse the pool thoroughly

Thoroughly rinse the internal surfaces with clean water, removing residual chemicals, oils, organic contamination and other deposits.
03

Dry it completely

Before folding, the walls, floor, folds and difficult-to-reach areas must be fully dry.
04

Deflate the pool

Only after washing and complete drying, release all air from the structure.
05

Fold it carefully

Fold the pool clean and dry, avoiding sharp creases and preventing debris from being trapped inside.
06

Store it in a dry place

Keep the clean, dry pool in suitable storage conditions until the next season.
THE MOST IMPORTANT STORAGE RULE
Never store the pool while it is wet.
Moisture and organic contamination trapped inside a folded pool for several months can create ideal conditions for mold. Mold, regrettably, appreciates this level of hospitality.
Fast to set up.
Easy to use.
Easy to store.
A full-size pool still needs a suitable site, filtration, maintenance and sensible operation. But the structure itself does not have to be complicated.
Need detailed step-by-step instructions?
Watch ISKYPOOL videos covering pool setup, filtration, skimmer installation and other equipment.
Watch ISKYPOOL video guides

← Back to all guides