ISKYPOOL  β€’   DROP STITCH POOLS & OUTDOOR LIVING

ISKYPOOL / Installation & care

How to prepare a site for a Drop Stitch pool

How to prepare a site for an ISKYPOOL Drop Stitch pool: ground stability, leveling, grass, concrete and sand, space around the pool and why direct burial in soil is not recommended.

Pool scene at sunset.
ISKYPOOL Β· SITE PREPARATION

How to prepare a site
for a Drop Stitch pool

Once filled, a full-size swimming pool places a significant load on the surface beneath it, whether the pool uses Drop Stitch technology, a metal frame or permanent construction.

But preparing a site for ISKYPOOL does not mean building a separate concrete foundation when one is not otherwise required.

THE BASIC RULE
Stable.
Level enough.
Clean.
Practical for you.

1. The base must be stable

The main job of the base is to remain stable under the load of the filled pool.

Avoid installing the pool on loose recently placed soil, uncompacted fill or an area that visibly settles under load.

Important: if the pool is to be installed on a deck, raised platform, roof, suspended slab or another man-made structure, its load capacity should not be guessed. It must be suitable for the actual combined load of the pool, water, equipment and users.

2. How level does the site need to be?

ISKYPOOL does not require you to turn your backyard into a surveying laboratory. The site does not need to be perfectly level to the millimetre.

However, there should be no significant visible slope. The water surface will always remain horizontal. If one side of the pool is noticeably higher than the other, the water level relative to the upper edge will also differ.

Do not rely on a universal slope number found online.
If the difference is clearly visible, correct the site before filling the pool.

3. Clean the entire surface

Inspect the complete pool footprint carefully before unfolding the pool.

Remove stones
Remove glass and metal
Remove branches
Check for sharp roots
Remove construction debris
Check for hidden protrusions

PVC can be repaired, but the best puncture, somewhat predictably, is the one that never happens.

4. What surfaces can the pool be installed on?

Grass
Suitable when the area is stable and sufficiently level. Check carefully for stones, roots and other hidden objects. Also expect a full pool sitting in one place for an extended period to affect the grass underneath it.
Prepared ground
Suitable when the soil is compacted, stable and does not have a significant slope. The entire surface must be free from objects that could damage the PVC.
Concrete
Can be used. Check for sharp edges, protrusions, damaged areas and abrasive surfaces. A concrete base is not automatically required for an ISKYPOOL installation.
Paving or tiles
Can be suitable when the base is stable and there are no sharp level changes, broken sections or protruding edges.

5. What about sand?

Sand is sometimes treated as a universal solution for any uneven pool site. It is not.

A thick layer of loose sand can redistribute and settle under load. ISKYPOOL therefore does not recommend simply placing a loose sand layer over an unsuitable base and assuming the site is now prepared.

If sand is used as part of the preparation for a particular site, the overall base still needs to remain stable, compacted and sufficiently level.

6. How much space should you leave around the pool?

There is no universal number.

The space you need depends on the pool size, ladder position, filtration system, heat pump, the layout of your property and the people using the pool.

The most reliable way to check:
unfold the pool in its intended location before inflation and physically make sure you can comfortably walk around it, use the ladder and service the equipment.

A Drop Stitch pool has no external supporting legs, so the space around it is primarily needed for people and equipment rather than for a structural metal frame.

ONE IMPORTANT QUESTION
Can you bury a Drop Stitch pool in the ground?

Technically, it is possible to design a project in which a Drop Stitch pool is installed below ground level.

However, ISKYPOOL strongly recommends against placing the pool directly against surrounding soil without a separate engineered structure that retains the ground around it.

1. Groundwater and buoyancy

An excavation can collect rainwater or groundwater. When water accumulates outside the pool, it can create upward buoyant force on the structure.

This is not normally a separate issue with a standard above-ground installation because the pool is not sitting inside an excavation that can fill with water. A below-ground project therefore needs its own drainage and groundwater strategy.

2. Soil pressure remains after the pool is drained

While the pool is full, the water inside creates outward pressure against the walls. But pools sometimes need to be drained for cleaning, servicing, repair or seasonal storage.

Once the water is removed, the surrounding soil does not disappear. Heavy wet ground can continue pressing inward against an empty pool wall.

Drop Stitch creates a very rigid wall at operating pressure, but the pool is not designed to serve as a retaining wall for an excavation.

3. Dirt, moisture and restricted access

With a normal above-ground installation, the owner can inspect, wash and dry the exterior of the pool.

Direct burial removes access to much of the outer surface. Moisture, soil and contamination may remain in constant contact with the wall, while inspection and maintenance become more difficult.

4. Soil movement and abrasive wear

Soil is not completely static. It becomes wet and dry, settles and changes through seasonal temperature cycles.

With direct burial, sand, small stones and soil particles can remain pressed against the external PVC surface. Movement between these materials and the pool creates additional mechanical abrasion.

In a normal surface installation, the pool is not permanently surrounded by moving soil.

5. Rodents and hidden damage

Protected spaces below ground can attract rodents and other small animals. An above-ground pool can be inspected around its exterior. After burial, damage may remain hidden because access to the outside wall is restricted.

IF A BELOW-GROUND INSTALLATION IS STILL REQUIRED
The pool should not be holding back the soil.
A separate structure should retain the surrounding ground, prevent direct lateral soil pressure from reaching the pool wall, provide drainage and protect the PVC from direct contact with soil and abrasive materials.

At that point, you are no longer simply β€œburying a swimming pool.”

You are creating a separate below-ground space in which the pool is installed. That is an engineering project that needs to be designed for the specific site.

ISKYPOOL recommendation
Use the pool above ground. If a project requires below-ground placement, isolate the pool from the surrounding soil with an independent retaining and drainage structure.

7. Check the site again during the early stage of filling

Even after preparing the site, do not immediately turn on the water and disappear to do something more entertaining.

Once the first amount of water is in the pool, pause and check:

β€’ whether the pool remains correctly positioned;
β€’ whether there is any obvious tilt;
β€’ whether the base is settling;
β€’ whether any hidden protrusion has become visible under load;
β€’ whether the ladder and equipment locations remain practical.

This is still the easy moment to correct a problem. Once the pool is completely full, it becomes considerably less convenient.

FINAL CHECK
Stable.
Level enough.
Clean.
Practical for you.
That is far more useful than relying on a universal clearance number invented for somebody else's pool and somebody else's backyard.
Site ready?
The next step is to unfold the pool, check the valve and inflate the structure correctly.
How to set up an ISKYPOOL pool

← Back to all guides